Railroad thermite welding
Wolfgang Lendner0 HN recommenders · 2017–2024
26.8M views · demo · evergreen · Uploaded 2011-08-07
A short video of railroad workers in Storfors, Sweden, using thermite to weld rail sections together.
Cited as a concrete example of how thermite is used for track welding in discussions of rail and thermite.
54:37How Self-Driving Cars will Destroy Cities (and what to do about it)
Not Just Bikes
18:14Stroads are Ugly, Expensive, and Dangerous (and they're everywhere) [ST05]
Not Just Bikes
17:03Why This Channel Exists (and why I hate Houston)
Not Just Bikes
9:39Why American Cities Are Broke - The Growth Ponzi Scheme [ST03]
Not Just Bikes
58:39Tim Ewald - Clojure: Programming with Hand Tools
ClojureTV
11:09The Wrong Way to Set Speed Limits [ST06]
Not Just Bikes
9:34Dick Proenneke in Alone in the Wilderness
swererbob
17:08Cities Aren't Loud: Cars Are Loud
Not Just Bikes
3 comments from Hacker News
I might be wrong about this, but I think thermite is used more often as a simple welding method. Railroad workers doing track maintainence routinely use thermite to repair damaged sections. [VIDEO]
This drove me down a rabbit hole, so I thought I would share. Track used to be separate pieces (seemingly before 1950), but they are now continuous welded rail [1][3]. This was done to allow trains to go faster, and lowers maintenance on the trains. This confused me because trains go "clack clack clack" - I guess that's foley now. However, it means track is more prone to buckling, since there aren't any expansion joints, like we have on bridges. Slack is added/removed from the rails by stressing the track during installation [2]. They heat (or mechanically stretch) the track to the length at a chosen "neutral" temperature. Then they install the track. This allows them to calculate the max expansion and contraction the track will see and offset those forces with the sleepers (horizontal forces?) and the ballast (vertical forces?). The rail can still buckle - this is engineering. If the ballast fails, or the temperatures exceed the maximum allowed for, then it will buckle. It also looks like it must be continually destressed by going along the rail, cutting it and re-welding it? [4] [1] [LINK] [2] [LINK] [3] Thermite track welding: [VIDEO] [4] [LINK]
Depends. It's used for welding, and the output is iron (magnetic): [VIDEO] I assume it would be too difficult to trigger the thermite reaction in the field with WWII tech, among other problems.